Track & Trace L3 to L2 Integration testing at FAT phase

About Project

Using CYBERLYNK enabled a T&T L3 system in Ireland (Customer Site - Pharma Manufacturer) to fully integrate seamlessly to a Level 2 (L2) Bio packaging Line located in the Italian Vendor FAT location (Vendor Site), which was connected to a second CYBERLYNK. Full L3 ⇔ L2 Integration was completed remotely over the secure CYBERLYNK connection.

The Challenge

Track & Trace systems are traditionally integrated at Site Acceptance Testing (SAT), after equipment delivery. This late-stage integration often exposes issues when project timelines are most constrained, increasing commissioning risk, delaying production start-up, and consuming on-site engineering resources.

Project Info

  • Client:

    Pharma Manufacturer

  • Project Stage:

    Factory Acceptance Testing (FAT)

  • Locations:

    Ireland ↔ Italy

  • CYBERLYNK Role:

    Pre-SAT Remote Integration

The CYBERLYNK Approach

CYBERLYNK securely connected the customer’s Level 3 Track & Trace system in Ireland to the vendor’s Level 2 packaging line during FAT in Italy. This enabled full L3 ⇔ L2 integration to be completed remotely, validating real production workflows before equipment delivery to the customer site.

Remote Integration Testing Performed
Outcomes & Business Impact

Time Saved:

8 weeks