
Using CYBERLYNK enabled a T&T L3 system in Ireland (Customer Site - Pharma Manufacturer) to fully integrate seamlessly to a Level 2 (L2) Bio packaging Line located in the Italian Vendor FAT location (Vendor Site), which was connected to a second CYBERLYNK. Full L3 ⇔ L2 Integration was completed remotely over the secure CYBERLYNK connection.
Track & Trace systems are traditionally integrated at Site Acceptance Testing (SAT), after equipment delivery. This late-stage integration often exposes issues when project timelines are most constrained, increasing commissioning risk, delaying production start-up, and consuming on-site engineering resources.
Pharma Manufacturer
Factory Acceptance Testing (FAT)
Ireland ↔ Italy
Pre-SAT Remote Integration
CYBERLYNK securely connected the customer’s Level 3 Track & Trace system in Ireland to the vendor’s Level 2 packaging line during FAT in Italy. This enabled full L3 ⇔ L2 integration to be completed remotely, validating real production workflows before equipment delivery to the customer site.
Time Saved:
8 weeks
We denounce with righteous indignation and dislike men who are so beguiled and demor alized by the charms of pleas ure of the moment, so blinded by desire. Neque qui is dolor emr ipsum quia dolor eque porro quisquam est.Tortor montes platea iacu lis posuere per mauris.